BESS Solar Power Systems (40–125kVA)

100kW BESS Container: 215kWh Price & Specs

This 100kW BESS container is the workhorse of our storage line: 100kW hybrid output with 215kWh of LFP storage, sized for rice mills and cold storage. The 100kW BESS is quoted factory-direct, CIF to your port, with full certification dossier.

100kW BESS container package staged for export at the Mars Solar Foshan factory

100kW BESS Specifications

ModelMS-100kw+215kwh BESS
TypeOff-Grid / Hybrid BESS Solar System
Rated Power100kW
Battery Storage215kWh
Output Voltage110V~800V
MOQ1 set — OEM & ODM accepted
CertificatesCE / RoHS · IEC 62619 · UN38.3 · ISO 9001
Payment TermsT/T — 30% deposit, 70% before shipment (50/20 for long-term partners)
Lead Time3–30 days depending on system scale
Warranty25-y solar panels · 10-y inverter · 5–10-y LFP battery · 2-y integration

All systems are quoted by configuration and destination port. Share your load profile and location, and we will return a firm CIF quotation within 24 hours.

  • ✓ ~100kWp solar array — roughly 420–460 kWh per day in good sun
  • ✓ 215kWh LFP cabinet: over 4 hours of autonomy at a 50kW average load
  • ✓ 100kW 3-phase hybrid inverter, diesel-genset compatible
  • ✓ Complete kit: panels, mounting, cabling, breakers, documentation
  • ✓ Same system family as our Nigeria rice mill project
100kW BESS wiring, inverter and BMS detail during factory quality control

What the System Includes

ComponentDetails
Solar PanelsN-type TOPCon half-cell modules (~625W class), 23% transfer efficiency, 25-year linear power warranty
Hybrid Inverter100kW PCS with built-in MPPT, AC grid charger, 3-phase output, anti-islanding protection
Energy Storage Cabinet215kWh LFP battery with built-in BMS & EMS, air cooling, 6,000+ cycles
Mounting SystemRooftop or ground-mount structures, customized to site survey
Cables & ConnectorsFull PV cable set, MC4 connectors, battery cables, DC breakers & SPD

Rice mills, packaging plants, hospitals, and office campuses that cannot afford downtime.

Product FAQ

How much does a 100kW BESS cost?
Storage typically adds 35–50% of total system cost. Derived from our verified 100kW + 215kWh container reference of CIF $88,000–115,000, installed LFP storage works out around $145–265 per kWh. This configuration quotes CIF $88,000–115,000 to ports such as Lagos or Manila.
How long does a 100kW BESS take to pay back?
Under 18 months when it displaces diesel generation, 3–5 years against peak grid tariffs. The LFP bank is rated 6,000+ cycles at 80% depth of discharge — roughly 16 years at one cycle per day.
Which certifications and import approvals apply?
CE / RoHS, IEC 62619 for the cells and UN38.3 for transport, built under ISO 9001 factory QA. Destination paperwork — SONCAP, BPS, SASO or DEWA — is prepared per shipment.
Can this system run a site with no utility grid?
Yes. The hybrid inverter forms its own stable 3-phase grid from the LFP battery bank, and solar input is prioritized automatically. A diesel genset can be wired into the inverter's AC input as backup, so the site keeps running through multi-day bad weather.
Can several units be paralleled for a larger plant?
Yes. Both the inverters and the battery cabinets support parallel connection — the 40–125kVA line is the building block we scale up to multi-MW plants (see our 6MW Nigeria factory project). Tell us your target capacity and we will propose a parallel configuration.
Is 100kW + 215kWh enough for a rice mill?
For most single-line rice mills with 50–80kW running load, yes — this is the same class of system we deployed for a rice mill in Nigeria. Mills running several lines or drying equipment in parallel may need the 125kVA unit or a parallel configuration. Send us your motor list and we will confirm sizing.

100kW BESS Price & Payback

What moves the 100kW BESS price? Module pricing first: tier-1 modules currently run $0.28–0.48 per watt FOB. Inverter class, mounting type and cable runs come next, and where batteries are included, storage typically adds 35–50% of the total system cost. Sea freight and clearing usually add 20–35% over FOB to reach West African or Southeast Asian ports.

Cost factorTypical figure (2026)
Solar modules$0.28–0.48 per watt FOB, tier-1 supply
Sea freight & landed costTypically +20–35% over FOB to West Africa / Southeast Asia ports
Storage share35–50% of total system cost where batteries are included
Payback3–5 years against grid power; under 18 months when replacing diesel

For a verified reference point: a complete 100kW + 215kWh BESS container quotes CIF $88,000–115,000 to ports such as Lagos or Manila. Every Mars Solar quote is factory-direct: FOB from our Foshan plant or CIF to your port, with the full certification dossier included.

For country-level landed-cost math, read the BESS import and payback guide for Nigeria, and see the 100kW + 215kWh wastewater plant project in Sudan for how the same hardware performs in the field. The IEA solar PV market track is a good neutral reference for global module price direction.

Need a Custom Configuration?

Send us your load profile and location — we return a firm CIF quotation within 24 hours.