Project Background

This supermarket in Willemstad runs refrigeration around the clock — the single largest energy consumer in Caribbean retail. With Curaçao's island grid generating almost all electricity from imported fossil fuels, commercial tariffs reached $0.38/kWh, among the highest in the world. Monthly electricity bills exceeded $14,000.

The Challenge: Refrigeration Loads Meet Island Tariffs

Refrigeration must never fail: a 2-hour outage can spoil tens of thousands of dollars in inventory. The supermarket needed to slash energy costs while guaranteeing backup power for cold-chain loads — in a hurricane-prone island environment.

The Solution: 250kW Solar + 500kWh Containerized BESS

Mars Solar engineered a rooftop + carport solar power system with a containerized battery energy storage system. The BESS provides backup for all refrigeration loads and peak-shaves the store's demand charges. The containerized system arrived pre-tested and was installed in 8 days — minimizing business disruption.

Solar PV Capacity250 kW (rooftop + carport arrays)
Battery Energy Storage500 kWh LFP, containerized
InvertersHybrid, hurricane-rated mounting
System TypeGrid-tied with backup + peak shaving
Cold-chain backupFull refrigeration load, 6+ hours
Installation8 days, containerized plug-and-play

Results & ROI

The system cut monthly electricity costs by $8,000+ — a 58% reduction. In two years of operation, the store has recorded zero unplanned downtime: the BESS has carried refrigeration through every grid event, including a major storm outage. The EPC contractor reports diagnosing issues remotely through the IoT monitoring platform.

Monthly savings$8,000+
Annual savings$96,000+
Payback period18 months
Energy cost reduction58%
Unplanned downtime in 2 yearsZero

“Mars Solar delivered the full design package in 72 hours, and the containerized BESS arrived pre-tested. Installation took 8 days. Two years of operation, zero unplanned downtime.”

— Sean Louvel, EPC Contractor, Curaçao

Implementation Timeline

Week 1
Energy audit and ROI modeling
Week 2–7
Engineering, manufacturing, factory testing
Week 8–11
Container shipping to Curaçao
Week 12–13
8-day installation, commissioning, training

Project Gallery

Supermarket Chain solar power system — Curaçao 1
Supermarket Chain solar power system — Curaçao 2
Supermarket Chain solar power system — Curaçao 3

Solar system for supermarket: What to Replicate

What makes a solar system for supermarket loads different is the cold chain: refrigeration runs around the clock, so the array is sized against daytime cooling demand while the LFP battery carries refrigeration through outages. In Curaçao's island grid — where commercial tariffs reached $0.38/kWh and monthly bills exceeded $14,000 — a solar system for supermarket loads paid back in about 18 months. We engineer mounting to hurricane wind loads, and size storage from your overnight refrigeration draw rather than from a rule of thumb.

Get the Same Results

Free system design and ROI estimate within 24 hours — based on your actual electricity bills.