⭐ Trusted by 3,000+ projects in 135+ countries

Commercial & Industrial Solar + Battery Storage Systems

See how businesses across West Africa, the Caribbean & Southeast Asia are slashing electricity costs with Mars Solar — from $108,000/month in electricity spend down to $2,300.

3,000+ Projects Done
135+ Countries
18yr Experience
25yr Panel Warranty
🏭ISO 9001 Certified · 18yr manufacturing
🛠️OEM & ODM · Any scale
🌍135+ Countries · 5 continents
🛡️24/7 Support + remote monitoring
⚙️10yr Warranty · Panel 25yr
⚙️ How It Works

From Inquiry to Commissioning in 4–12 Weeks

A proven 4-step process refined across 3,000+ international projects. Every step has a senior engineer accountable.

1
📋

Consultation & Site Assessment

Tell us your load profile, electricity tariff, and goals. We deliver a free ROI analysis within 48 hours based on your actual numbers.

⏱ 1–3 days
2
🔧

Engineering & Manufacturing

Our engineers finalize the system design, then your panels and BESS go into production. Every battery module is 72-hour full-load tested before shipping.

⏱ 1–6 weeks
3
🚢

Shipping & Customs

Door-to-door logistics arranged by our export team. FOB Shenzhen, CIF, or DDP available. We handle all export documentation.

⏱ 2–6 weeks
4
✅

Installation & Commissioning

For projects above 200kW, 2–4 Mars Solar engineers fly on-site. For smaller systems, we provide remote commissioning + your local team.

⏱ 3–14 days
⭐ Featured Results

Real Projects. Real Savings.

Click any tab to explore detailed case studies from our most impactful projects.

🇨🇼 Willemstad, Curaçao

250kW Solar for Supermarket

250kW + 500kWh · $8,000+/mo · ROI 18 months

A major supermarket chain in Willemstad cut a monthly electricity bill of over $14,000 by $8,000+ — a 58% reduction. 3 Mars Solar engineers flew on-site for an 8-day installation. 25-year ROI exceeds 1,500%.

🇳🇬 Nigeria

6MW 20MWh for Industrial Complex

6MW + 20MWh · $108,000+/mo · ROI ~24 months

Integrated factory, farm and residential complex. Monthly savings of $108,000+. Peak shaving, load shifting and 24/7 backup ensure uninterrupted operations. EMS intelligently coordinates battery charge/discharge cycles.

🇵🇭 Palawan, Philippines

60kW for Beach Resort

60kW + 120kWh · ₱100,000+/mo · ROI 15 months

A luxury beachfront resort in Palawan eliminated diesel generator costs and now runs entirely on solar. 5-day installation by a 4-person Mars Solar crew. 25-year ROI exceeds 1,900%.

🇿🇦 South Africa

1MW + 2MWh for Fruit Processor

1MW + 2MWh · $18,000+/mo · ROI 32 months

A fruit processing factory with high daytime energy demand. 1MW rooftop PV + 2MWh containerized BESS eliminates peak-hour charges. Year 1 savings exceed $216,000.

🇱🇷 Liberia

50kW + 150kWh for Bank Branch

50kW + 150kWh · $2,300/mo · ROI 13 months

A rural Liberian bank branch eliminated diesel generator dependency. Mars Solar designed and installed the complete off-grid system within 7 days. Annual savings exceed $27,600 with zero fuel logistics costs.

🇸🇩 Sudan

100kW + 215kWh Wastewater Plant

100kW + 215kWh · $7,000/mo · ROI 12 months

A municipal wastewater treatment facility in Sudan slashed its diesel bill by 70%. Mars Solar engineered the hybrid solar+diesel solution with intelligent load management. Reliable 24/7 operation throughout the dry season.

🇿🇼 Zimbabwe

100kW + 200kWh Remote School

100kW + 200kWh · $4,500+/mo · ROI 13 months

A rural school serving 600+ students now runs entirely on solar, replacing expensive diesel generators. Students have reliable power for evening study and computer labs. Teachers report a 40% increase in evening class attendance.

🇳🇬 Abuja, Nigeria

200kW + 430kWh Rice Mill

200kW + 430kWh · $8,000+/mo · ROI 14 months

A commercial rice mill in Abuja, Nigeria replaced diesel generation with a 200kW PV + battery storage system. Monthly diesel power costs dropped by $5,000–11,000. Payback confirmed at 14 months by actual electricity bills.

📁 More Projects

3000+ Projects. 135+ Countries.

Click any project to see full details and photos.

6MW 20MWh Industrial Complex
View Details →
Nigeria

6MW 20MWh Industrial Complex

$108,000+/mo ROI ~24 months
50kW 150kWh Bank Branch
View Details →
Liberia

50kW 150kWh Bank Branch

$2,300/mo ROI 13 months
100kW 215kWh Wastewater Plant
View Details →
Sudan

100kW 215kWh Wastewater Plant

$7,000/mo ROI 12 months
250kW 500kWh Supermarket
View Details →
Curaçao

250kW 500kWh Supermarket

$8,000+/mo ROI 18 months
60kW 120kWh Beach Resort
View Details →
Philippines

60kW 120kWh Beach Resort

₱100,000+/mo ROI 15 months
1MW 2MWh Fruit Processor
View Details →
South Africa

1MW 2MWh Fruit Processor

$18,000+/mo ROI 32 months
200kW 430kWh Rice Mill
View Details →
Abuja, Nigeria

200kW 430kWh Rice Mill

$8,000+/mo ROI 14 months
100kW 200kWh Remote School
View Details →
Zimbabwe

100kW 200kWh Remote School

$4,500+/mo ROI 13 months
🧮 ROI Calculator

Calculate Your Solar ROI

Enter your details to see how much you could save every month.

Solar factory ROI
Before Solar
$0 saved
After Solar (est.)
$0/mo saved
💬 Client Stories

What Our Clients Say

Real feedback from factory owners, resort operators and EPC partners across 4 continents.

★★★★★

"We installed Mars Solar's 60kW + 120kWh hybrid system in early 2023. Our monthly electricity bill dropped from ₱145,000 to ₱25,000 — an 83% reduction. The installation team completed everything in 5 days, and the system handled Typhoon Egay without any issues."

RS
Ricardo Santos
Owner, Palawan Beach Resort · Philippines
★★★★★

"We contracted Mars Solar for a 250kW solar + storage system at a supermarket in Curaçao. Their engineering team delivered the full design package in 72 hours, and the containerized BESS arrived pre-tested. Installation took 8 days. Two years in, zero unplanned downtime."

SL
Sean Louvel
EPC Contractor · Curaçao
★★★★★

"We installed Mars Solar's 60kW system at our PVC factory in Lagos. Our monthly diesel and electricity costs dropped from ₦2.5 million to under ₦400,000. 18 months in, zero downtime. Their remote monitoring caught a minor inverter issue before it became a problem."

EO
Emeka Okafor
Factory Manager, Lagos PVC Manufacturing · Nigeria
❓ FAQ

Frequently Asked Questions

How does Mars Solar ensure installation quality overseas?
Every international project is overseen by our senior engineers. For large-scale projects (above 200kW), 2–4 Mars Solar engineers travel on-site for installation, commissioning and grid synchronization. All crews are trained on our containerized BESS standards before departure.
What is the typical ROI for commercial solar in West Africa or the Caribbean?
Based on 300+ international projects, commercial solar ROI in these regions typically ranges from 12 to 32 months, depending on local electricity tariffs. Higher tariffs mean faster payback — our Curaçao supermarket achieved 18-month ROI; Nigeria 6MW achieved ~24 months.
Can Mars Solar handle projects in remote locations with poor grid access?
Yes. Our off-grid and hybrid solar+storage systems are specifically designed for areas with unstable or absent grid infrastructure. We provide full system design, battery sizing, and EMS configuration. Our Zimbabwe remote school and Nigeria rice mill projects prove this capability.
What after-sales support is provided?
All systems come with 10-year comprehensive warranty (panels: 12-year product warranty and 25-year linear power output warranty; battery: 10-year / 6,000-cycle warranty). We provide remote monitoring via our web platform, on-call technical support, and can dispatch engineers for on-site service when needed.
How long does a typical commercial project take from inquiry to commissioning?
Standard timeline: 1–3 days for consultation and site assessment; 1–6 weeks for engineering and manufacturing (72-hour continuous test for BESS); 2–6 weeks for shipping; 3–14 days on-site installation and commissioning. Total: 4–12 weeks depending on project size and location.
Does Mars Solar offer financing or payment terms?
We charge 30% as a deposit to start production and collect the remaining 70% before shipment. Repeat customers (3+ transactions) and orders above $300,000 can pay 50% before shipment and the final 20% after commissioning and delivery.

Free Quote

Get Your Free Quote

Send us your load profile and target budget — our engineers reply with a complete system design and a firm CIF price within 24 hours.

Firm CIF quotation within 24 hoursFree system design from your load profile3,000+ projects delivered in 135+ countriesCE / IEC certified · 30/70 T/T payment

We reply within 24 hours on WhatsApp or email. Your information stays confidential.

Ready to Cut Your Electricity Bill?

Get a free system design and ROI estimate within 24 hours. No commitment required.