Application-Specific Solar Solutions

Solar System for Factory

Industrial solar-plus-storage at production scale: from 100kW workshops to our 6MW factory installation in Nigeria — engineered around your production schedule, not the other way around.

Mars Solar factory solar system solution for industrial plants

Specifications

ModelMS-Solar System for Factory
TypeTurnkey Solar Solution — Industrial
Rated Power100kW–6MW
Battery StorageProject-based
Output VoltageDC 110V/220V/380V · AC 110V~480V
MOQ1 set — OEM & ODM accepted
CertificatesCE / RoHS · IEC 62619 · UN38.3 · ISO 9001
Payment TermsT/T — 30% deposit, 70% before shipment (50/20 for long-term partners)
Lead Time3–30 days depending on system scale
Warranty25-y solar panels · 10-y inverter · 5–10-y LFP battery · 2-y integration

All systems are quoted by configuration and destination port. Share your load profile and location, and we will return a firm CIF quotation within 24 hours.

  • ✓ Peak shaving and demand-charge management built in
  • ✓ BESS keeps critical lines running through outages
  • ✓ Scalable to multi-MW with parallel inverter blocks
  • ✓ 72-hour full-load factory test before shipment
  • ✓ Full engineering pack: SLD, layout, grid-compliance support
Mars Solar factory solar system solution for industrial plants

What Every Solution Includes

ComponentDetails
EngineeringLoad analysis from your appliance/equipment list, system sizing, single-line diagram, and layout drawings
EquipmentComplete solar + storage package matched to the application profile — panels, inverter, batteries, mounting, cabling
DocumentationPacking list, certification documents, installation manual, and wiring diagrams
Commissioning SupportVideo-guided installation support and remote commissioning by our engineering team
After-SalesLifetime remote technical support with defined warranty on every component

Manufacturing plants with 24/7 or shift-based production in high-tariff or unstable-grid regions.

Product FAQ

How do you size a solution for my specific site?
We start from data, not guesswork: your appliance or equipment list, daily usage hours, roof or land availability, and grid/outage situation. From that we produce a load analysis and a sized proposal with firm pricing. Site photos and a recent electricity bill (or genset fuel log) speed the process considerably.
Do you send engineers to install?
Most projects are installed by local crews with our video guidance and live remote commissioning — proven across 135+ countries. For large or complex plants we can discuss on-site engineering support. Either way, every system ships with complete drawings and manuals.
How does solar-plus-storage pay back for a factory?
Against diesel generation at $0.25–0.35/kWh, industrial systems in our markets typically pay back in 12–24 months; against grid tariffs, 3–5 years depending on your rate structure. The 6MW Nigeria project displaced the majority of the factory's diesel consumption — see the case study for the real numbers, or send us your fuel log for a tailored model.

Need a Custom Configuration?

Send us your load profile and location — we return a firm CIF quotation within 24 hours.