Grid-Tied & Hybrid Solar Power Systems (10kW–1MW)

80kW Solar System for Factories: Price & Design

This 80kW solar system serves businesses outgrowing the small-system class: serious generation without the logistics overhead of a 100kW+ plant. Each 80kW solar system is engineered to your load profile and shipped as one container-ready package.

80kW solar system container package staged for export at the Mars Solar Foshan factory

80kW solar system Specifications

ModelMS-80KW
TypeOn-Grid Commercial Solar Power System
Rated Power80kW
Battery StorageOptional — LFP battery bank sized to project
Output Voltage110V~800V
MOQ1 set — OEM & ODM accepted
CertificatesCE / RoHS · IEC 62619 · UN38.3 · ISO 9001
Payment TermsT/T — 30% deposit, 70% before shipment (50/20 for long-term partners)
Lead Time3–30 days depending on system scale
Warranty25-y solar panels · 10-y inverter · 5–10-y LFP battery · 2-y integration

All systems are quoted by configuration and destination port. Share your load profile and location, and we will return a firm CIF quotation within 24 hours.

  • ✓ ~80kWp solar array — roughly 330–370 kWh per day in good sun
  • ✓ Single-container logistics with complete accessory kit
  • ✓ 3-phase hybrid-ready inverter
  • ✓ Customized mounting engineering included
  • ✓ Optional remote monitoring
80kW solar system wiring, inverter and BMS detail during factory quality control

What the System Includes

ComponentDetails
Solar PanelsN-type TOPCon half-cell modules, fully automatic slicing & EL-tested 4 times, 25-year linear power warranty
Grid-Tied / Hybrid Inverter80kW rated, 3-phase output, MPPT inputs, anti-islanding and surge protection
Mounting SystemSteel/aluminum structures for rooftop or ground installation, engineered to site wind load
Cables & ConnectorsComplete PV cable set, MC4 connectors, DC breakers, SPD, and grounding accessories
Monitoring (Optional)IoT remote monitoring with mobile app for generation and alarm tracking

Clinics, mid-size farms, and commercial plazas with 50–70kW loads.

Product FAQ

How much does a 80kW solar system cost in 2026?
Tier-1 modules run $0.28–0.48 per watt FOB, so a 80kW solar system starts at $22,400–38,400 in modules alone; inverters, mounting and sea freight (typically +20–35% over FOB) complete the landed figure. Send us your load profile and we will return a firm CIF quote within 24 hours.
How long does a 80kW solar system take to pay back?
Against grid tariffs, 3–5 years. Where the system displaces diesel generation at $0.30–0.60 per kWh all-in, payback falls to under 18 months — which is why factories and mills switch first.
Which certifications and import approvals apply?
Modules carry IEC 61215 with IEC 61701 salt-mist testing and inverters ship CE / IEC 62109. For imports we prepare SONCAP for Nigeria, BPS for the Philippines (mandatory from July 2027) and SASO or DEWA paperwork for the Gulf.
Can I add battery storage to this system later?
Yes. Every system in this line can be ordered as a pure grid-tied plant and upgraded later: our hybrid inverters accept LFP battery cabinets (50kWh–6MWh) without replacing the solar array. If you know storage is coming, tell us now — we will pre-wire the AC/DC distribution to make the upgrade a one-day job.
Will the system comply with my country's grid code?
The inverters carry CE and grid-compliance settings for the main export markets we serve (West Africa, Southeast Asia, the Caribbean, Latin America). For markets with mandatory conformity programs — e.g. SONCAP for Nigeria — we prepare the certification documents with the shipment. Confirm your utility's requirements with us before ordering.
Can I start at 80kW and expand to 160kW later?
Yes. We design the distribution and mounting with expansion in mind: order now, add a second 80kW block later, and the two run in parallel on one monitoring account. Just tell us expansion is planned so we size the combiner and cabling accordingly.

80kW solar system Price & Payback

What moves the 80kW solar system price? Module pricing first: tier-1 modules currently run $0.28–0.48 per watt FOB. Inverter class, mounting type and cable runs come next, and where batteries are included, storage typically adds 35–50% of the total system cost. Sea freight and clearing usually add 20–35% over FOB to reach West African or Southeast Asian ports.

Cost factorTypical figure (2026)
Solar modules$0.28–0.48 per watt FOB, tier-1 supply
Sea freight & landed costTypically +20–35% over FOB to West Africa / Southeast Asia ports
Storage share35–50% of total system cost where batteries are included
Payback3–5 years against grid power; under 18 months when replacing diesel

For a verified reference point: our most-ordered 100kW solar system paired with a 215kWh BESS cabinet quotes CIF $88,000–115,000 to ports such as Lagos or Manila. Every Mars Solar quote is factory-direct: FOB from our Foshan plant or CIF to your port, with the full certification dossier included.

For country-level landed-cost math, read the commercial solar system sizing guide, and see the 200kW rice mill project in Nigeria for how the same hardware performs in the field. The IEA solar PV market track is a good neutral reference for global module price direction.

Need a Custom Configuration?

Send us your load profile and location — we return a firm CIF quotation within 24 hours.